in the bathroom:
-
-
-
-
-
- conceal/waterproof water heater wiring
in the kitchen:
-
- install cabinet lights * 3
- install fridge
- plaster brackets to conceal wiring
- cabinet bracket missing
in the main hall:
- install washing machine
-
-
- *KIV*
-
- double check main door (not closing on itself properly)
outside:
-
-
upstairs:
-
-
- touch up plastering around LED lights
- install tv
- polish stairs and flooring
- touch up area around switch/plug points
curtains - awaiting installation
progress much? alhamdulillah.
No comments:
Post a Comment