what we have so far after a sabbatical disappearance to LIMA last week:

in the bathroom:
- install water heater
- install bathroom mirror
- install towel hanger
- install toiletries stand
- replace bathroom light
- conceal/waterproof water heater wiring

in the kitchen:
- add another light point
- install cabinet lights * 3
- install fridge
- plaster brackets to conceal wiring
- cabinet bracket missing

in the main hall:
- install washing machine
- install fan with 3 feet extender
- replace living room lights with drop down ones
- *KIV* add 4 light points (recycle original bedroom n living room lights)
- add 4 power points

- double check main door (not closing on itself properly)

outside:
- install outdoor ceiling light
- install doorbell

upstairs:
- add 2 power points
- replace bedroom lights with LED lights
- touch up plastering around LED lights
- install tv
- polish stairs and flooring
- touch up area around switch/plug points

curtains - awaiting installation

doorgrill

progress much? alhamdulillah.